• Skip to primary navigation
  • Skip to main content
  • Skip to footer
Spire Property Consultants logo 2

Spire Property Consultants

CofE Diocese of Norwich

Gary Atkins

Fakenham, Church of St Peter and St Paul, Access Improvements

30 July, 2025 • Written by Gary Atkins

Fakenham, Norfolk

Church of St Peter and St Paul

Client: PCC of St Peter and St Paul

Project Cost: £100,000

Contractor: King and Company Ltd

Date Complete: June 2024

An initial options appraisal for access improvements was carried out by Spire Property Consultants, leading to the successful implementation of works completed in June 2024. The project focused on creating improved access into the church for wheelchairs, buggies, and those with mobility challenges, alongside developing an open, flexible, and welcoming space for meeting and greeting. Additional storage and display areas were incorporated to accommodate the Card and Book stalls and other church items. The new welcome area was designed to balance openness with privacy, offering comfort, encouragement, and confidence to all members of the community, visitors, and those seeking help and support.

Before 2
Before
IMG_3723
IMG_3714
IMG_3717
IMG_3716

Filed Under: Project, Project- Churches Tagged With: access improvements, Accessibility, architectural improvement, CHurch, church building, fakenham, fakenham st peter and st paul

Gressenhall, Church of St Mary, Re-roofing

30 July, 2025 • Written by Gary Atkins

Gressenhall, Norfolk

Re-roofing project

Client: PCC of St Mary Gressenhall

Project Cost: £55,000

Contractor: C.E.L. Group

Date Complete: December 2021

Spire Property Consultants were appointed to undertake essential roof conservation works. This included replacing the deteriorated lead covering on the nave roof with terne-coated stainless steel with wood core rolls, a durable and visually sympathetic alternative that ensures long-term protection while respecting the building’s historic character. In addition, a new roof was installed on the tower roof to maintain traditional detailing and safeguard the structure against water ingress

  • DJI_20241209105645_0080_D
  • DJI_20241209110127_0090_D
  • DJI_20241209110231_0094_D
  • IMG_2580
  • IMG_2603
  • IMG_6568
  • IMG_6569
  • IMG_6575
  • IMG_6592

Filed Under: Project, Project- Churches Tagged With: CHurch, church building, Gressenhall, Lead roof, Norfolk, re-roofing, St Mary

Gressenhall, Church of St Mary, Reordering

30 July, 2025 • Written by Gary Atkins

Gressenhall, St Mary

Reordering

Client: PCC of St Mary Gressenhall

Project Cost: £102,000

Contractor: Greystone and Mason Ltd

Date Complete: June 2024

The project focused on adapting the historic church building to serve as a safe, inclusive, and flexible community asset while preserving its architectural significance. At the west end of the nave and north aisle, areas were carefully rendered to create an open and welcoming space suitable for a variety of community activities. To improve accessibility and meet modern standards, new toilet facilities were installed at the west end of the north aisle, designed to integrate sensitively within the existing fabric. Kitchen facilities were introduced within the existing vestry, incorporating a moveable servery to allow for versatile use without compromising the historic layout. In addition, the project included the installation of a new foul drainage system to support these enhancements, ensuring compliance with building and environmental regulations.

All interventions were undertaken with consideration for the building’s heritage value, using appropriate materials and methods to minimise impact on historic fabric while enabling sustainable future use.

IMG_9175
IMG_9176
IMG_9177
IMG_9178
IMG_9227

Filed Under: Project, Project- Churches

Footer

© Spire Property Consultants. All rights reserved.